Big Bar Ferry Both directions |
Closed in both directions at Fraser River because of Ferry Out of Service. Aerial Tram is available to foot traffic only. Updated on Sat Apr 21 at 4:11 am PDT. (ID# 252781) |
Highway 1 Both directions |
Rock Scaling 13 KM North of Spences Bridge occuring from 7:30 am to 5:30 pm Mon-Fri, April 4 through Apr 27, 2018. Note: Work will also be occurring on Saturday April 21, 2018 from 7:30 am to 5:30 pm. The road is reduced to single lane alternating traffic with up to 20 minutes delay. Updated on Fri Apr 20 at 8:34 am PDT. (ID# -68219) |
Highway 20 Both directions |
Maintenance 5 km east of Young Creek to 31 km west of Anahim Lake (18.9 km), 10:00 am to 6:30 pm daily starting Apr 23 through Apr 24. The road will be reduced to single lane alternating traffic. Updated on Fri Apr 20 at 9:04 am PDT. (ID# -68580) |
Highway 20 Both directions |
Muddy Sections 40 km west of Anahim Lake to Anahim Lake (40 km). Updated Sat Apr 21 at 4:13 am PDT. (ID# 283275) |
Highway 20 Both directions |
Muddy Sections from Hagensborg to Anahim Lake (120.9 km). Updated Sat Apr 21 at 4:13 am PDT. (ID# 283276) |
Highway 26 Both directions |
Brushing 1 to 10 km west of the Junction of Highway 97, in Quesnel 8:00 am to 6:00 pm Mon-Sat starting Apr 18 through Apr 30. The road will be reduced to single lane alternating traffic. Updated on Wed Apr 18 at 10:31 pm PDT. (ID# -68494) |
Highway 26 Both directions |
Brushing and tree trimming on Hwy 26 between Blueridge Road and Callis Road from 8:00 am to 6:00 pm Monday to Friday from April 18 to April 30. The road will be reduced to single lane alternating traffic with expected 5 minute delays. Watch for flagging personnel. Updated on Thu Apr 19 at 12:04 am PDT. (ID# -68490) |
Highway 97 Both directions |
Construction 2 km north of junction of Hwy 97 and Hwy 20 in Williams Lake from 7:00 am to 5:30 pm Monday through Saturday starting Apr 10 through Dec 15. Possible traffic delays, watch for changing traffic patterns and flagging personnel. Updated on Tue Apr 10 at 7:08 am PDT. (ID# -68288) |
Highway 99 Both directions |
Maintenance Hwy 99 9.5 km north of Lillooet starting Monday April 23 at 7:00 am through to Wednesday May 2 at 7:00 pm. The road will be reduced to single lane alternating traffic with expected 5 minute delays. Watch for flagging personnel. Updated on Thu Apr 19 at 10:45 am PDT. (ID# -68565) |
Highway 99 Both directions |
Mud Slide 15 km north of Lillooet. The road is reduced to single lane alternating traffic. Updated on Sat Apr 21 at 4:12 am PDT. (ID# 283216) |